December 2013

Reclamation work for formation of terminal territory and construction of southern and northern embankments has been completed. Pavement of access road from existing terminal along southern embankment to berth 2k, pavement of quay apron and operational area with width of 65m covering full length of berth 2k, and installation of surface water drainage network of berth 2k including central collector/separator and pump system for linking existing terminal’s drainage water system, and water supply system for berth 2k have been completed. Electrical works for installation of 3.5km MT feed cable (6.0kV) from substation ‘Morskaya’ to Port’s substation DP-6, installation of MT cable (6.0kV) from DP-6 to terminal substation TS-1, modification and extension of substations Morskaya and DP-6, installation of MT cable to berth 2k (STS connection points), installation of LT terminal grid (0.4kV) and communication lines of berth 2k have been completed. Three STS cranes have been delivered and they are under erection now.

OKV_6897.JPG

Февраль / February 2013

Производство намывных работ землесосом «Werner Moebius» по формированию территории терминала. При намыве используется песок с «Одесской банки». Объём песка за февраль 2013г. – 131882.2 м3. Всего – 1983966.1 м3. Изготовление и поставка щелевых плит (46.9м3), тетраподов 1.5т (100 шт.).
Reclamation works for formation of terminal territory with dredger ‘Werner Moebius’. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for February 2013 is 131882.2m3. Total sand volume is 1983966.1 m3. Production and delivery of drain plates (46.9m3), tetrapods 1.5t (100 units).

Галерея G65

Декабрь 2012 - январь 2013 / December 2012 - January 2013

Производство намывных работ землесосом «Werner Moebius» по формированию территории терминала. При намыве используется песок с «Одесской банки». Объём песка за декабрь 2012г. – январь 2013г. – 166997.0 м3. Всего – 1852083.9 м3. Приемка и выгрузка тетраподов 1.5т (291 шт.).
Reclamation works for formation of terminal territory with dredger ‘Werner Moebius’. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for December 2012 – January 2013 is 166997.0 m3. Total sand volume is 1852083.9 m3. Delivery and unloading of tetrapods 1.5t (291 units).

Галерея G64

Ноябрь / November 2012

Производство намывных работ землесосом «Werner Moebius» по формированию территории терминала по трубопроводу. Производство намывных работ землесосом «Werner Moebius» за шпунтовую стенку причала 1К методом дугового намыва и через трубопровод. При намыве используется песок с «Одесской банки». Объём песка за ноябрь 2012 г. – 208600.2 м3. Всего – 1685086.9 м3. Приемка и выгрузка щелевых плит (68.34м3), тетраподов 1.5т (845 шт.), щебня (1497.39 т) и камня различных фракций (4216.85 т). Производство работ по планировке откосов песчаной отсыпки дамбы южного берегоукрепления (участок длинной 295 м). Отсыпка камня (3868.19 м3) и щебня (418.27 м3) в тело южного берегоукрепления; наброска тетраподов 1.5т (800 шт.).
Reclamation works for formation of terminal territory with dredger ‘Werner Moebius’ using hydraulic fill pipeline. Sandfill back to quaywall of berth 1k with dredger ‘Werner Moebius’ both by rainbowing method and hydraulic fill pipeline. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for November 2012 is 208600.2 m3. Total sand volume is 1685086.9 m3. Delivery and unloading of drain plates (68.34 m3), tetrapods 1.5t (845 units), crushed stone (1497.39 t) and rock of different fractions (4216.85 t). Slope grading of southern embankment (section of 295m). Fill of rock (3868.19 m3) and crushed stone (418.27 m3) for arrangement of southern embankment; placement of tetrapods 1.5t (800 units).

Галерея G60

Октябрь / October 2012

Производство намывных работ землесосом «Werner Moebius» по формированию территории терминала по трубопроводу. Производство намывных работ землесосом «Werner Moebius» за шпунтовую стенку причала 1К методом дугового намыва и через трубопровод. При намыве используется песок с «Одесской банки». Объём песка за октябрь 2012 г. – 213563.2 м3. Всего – 1476486.7 м3. Приемка и выгрузка тетраподов 1.5т (1000 шт.), щебня (368.12 т) и камня различных фракций (4525.25 т). Производство работ по планировке откосов песчаной отсыпки дамбы южного берегоукрепления (участок длинной 295 м). Отсыпка камня (3453.4 м3) и щебня (896.12 м3) в тело южного берегоукрепления; наброска тетраподов 1.5т (1087 шт.).
Reclamation works for formation of terminal territory with dredger ‘Werner Moebius’ using hydraulic fill pipeline. Sandfill back to quaywall of berth 1k with dredger ‘Werner Moebius’ both by rainbowing method and hydraulic fill pipeline. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for October 2012 is 213563.2 m3. Total sand volume is 1476486.7 m3. Delivery and unloading of tetrapods 1.5t (1000 units), crushed stone (368.12 t) and rock of different fractions (4525.25 t). Slope grading of southern embankment (section of 295m). Fill of rock (3453.4 m3) and crushed stone (896.12 m3) for arrangement of southern embankment; placement of tetrapods 1.5t (1087 units).

Галерея G55

Сентябрь / September 2012

Производство намывных работ землесосом «Werner Moebius» по формированию территории терминала по трубопроводу. Производство намывных работ землесосом «Werner Moebius» за шпунтовую стенку в сопряжении причалов 2К и 1К методом дугового намыва и через трубопровод. При намыве используется песок с «Одесской банки». Объём песка за сентябрь 2012 г. – 205950.7 м3. Всего – 1262923.5 м3. Приемка и выгрузка тетраподов 1,5т (1357 шт.), щебня (741,3 т) и камня различных фракций (7399,19 т). Производство работ по планировке откосов песчаной отсыпки дамбы южного берегоукрепления (участок длинной 295 м). Отсыпка камня (2635,37 м3) и щебня (318,22 м3) в тело южного берегоукрепления; наброска тетраподов 1,5т (1107 шт.).
Reclamation works for formation of terminal territory with dredger ‘Werner Moebius’ using hydraulic fill pipeline. Sandfill back to quaywall in the zone of junction of berths 2k and 1k with dredger ‘Werner Moebius’ both by rainbowing method and hydraulic fill pipeline. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for September 2012 is 205950.7 m3. Total sand volume is 1262923.5 m3. Delivery and unloading of tetrapods 1.5t (1357 units), crushed stone (741.3 t) and rock of different fractions (7399.19 t). Slope grading of southern embankment (section of 295m). Fill of rock (2635.37 m3) and crushed stone (318.22 m3) for arrangement of southern embankment; placement of tetrapods 1.5t (1107 units).

Галерея G53

Август / August 2012

Производство намывных работ землесосом «Werner Moebius» по формированию территории терминала по пульпопроводу. Производство намывных работ землесосом «Werner Moebius» за шпунтовую стенку причала 2К методом дугового намыва. При намыве используется песок с «Одесской банки». Объём песка за август 2012 г. – 272959.8 м3. Всего – 1056972.8 м3. Приемка и выгрузка тетраподов, щебня и камня различных фракций. Производство работ по планировке откосов песчаной отсыпки дамбы южного берегоукрепления (участок длинной 295 м). Отсыпка камня и щебня в тело южного берегоукрепления.
Reclamation works formation of terminal territory with dredger ‘Werner Moebius’ using hydraulic fill pipeline. Sandfill back to quaywall of berth 2k with dredger ‘Werner Moebius’ by rainbowing method. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for August 2012 is 272959.8 m3. Total sand volume is 1056972.8 m3. Delivery and unloading of tetrapods, rock and crushed stone of different fractions. Slope grading of southern embankment (section of 295m). Fill of crushed stone and rock for arrangement of southern embankment.

Галерея G51

Июль / July 2012

Производство намывных работ землесосом «Werner Moebius» по расширению дамбы южного берегоукрепления и формированию территории терминала по пульпопроводу. Производство намывных работ землесосом «Werner Moebius» за шпунтовую стенку причала 2К методом дугового намыва. При намыве используется песок с «Одесской банки». Объём песка за июль 2012 г. – 312754 м3. Всего – 784013 м3. Формирование строительной площадки на намытой территории с организацией стройгородка и зон для поставки и хранения строительных материалов (тетраподы, камень, щебень). Приемка и выгрузка тетраподов, щебня и камня различных фракций. Производство работ по планировке откосов песчаной отсыпки дамбы южного берегоукрепления (участок длинной 295 м). Отсыпка камня и щебня в тело южного берегоукрепления.
Reclamation works for extension of southern embankment and formation of terminal territory with dredger ‘Werner Moebius’ using hydraulic fill pipeline. Sandfill back to quaywall of berth 2k with dredger ‘Werner Moebius’ by rainbowing method. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for July 2012 is 312754 m3. Total sand volume is 784013 m3. Arrangement of construction site on reclaimed territory with offices and zones for delivery and storage of construction materials (tetrapods, rock, crushed stone). Delivery and unloading of tetrapods, rock and crushed stone of different fractions. Slope grading of southern embankment (section of 295m). Fill of crushed stone and rock for arrangement of southern embankment.

Галерея G48

Июнь / June 2012

Производство намывных работ землесосом «Werner Moebius» по расширению дамбы южного берегоукрепления и формированию территории терминала по пульпопроводу. Производство намывных работ землесосом «Werner Moebius» за шпунтовую стенку причала 2К методом дугового намыва. При намыве используется песок с «Одесской банки». Объём песка за июнь 2012 г. – 284080 м3. Всего – 471259 м3. Приемка и выгрузка тетраподов.
Reclamation works for extension of southern embankment and formation of terminal territory with dredger ‘Werner Moebius’ using hydraulic fill pipeline. Sandfill back to quaywall of berth 2k with dredger ‘Werner Moebius’ by rainbowing method. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for June 2012 is 284080 m3. Total sand volume is 471259 m3.

Галерея G47

Май / May 2012

Намывные работы не производятся в связи с нерестовым периодом.
Reclamation works are suspended due to spawning season.

May12-1.JPG

Апрель / April 2012

Производство намывных работ по устройству и расширению дамбы южного берегоукрепления, а также за шпунтовую стенку причала 2К методом дугового намыва. Работы по намыву проводятся земснарядом «Werner Moebius», методом дугового намыва. При намыве используется песок с «Одесской банки». Объём песка за апрель 2012 г. – 238521 м3. Всего – 255629 м3.
Reclamation works for arrangement and extension of southern embankment as well as sandfill back to quaywall of berth 2k with dredger ‘Werner Moebius’ by rainbowing method. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for April 2012 is 170071 m3. Total sand volume is 187179 m3.

Галерея G45

Март / March 2012

Производство намывных работ по устройству дамбы южного берегоукрепления. Работы по намыву проводятся земснарядом «Werner Moebius», методом дугового намыва. При намыве используется песок с «Одесской банки». Объём песка за март 2012 г. – 17108 м3.
Reclamation works for arrangement of southern embankment with dredger ‘Werner Moebius’ by rainbowing method. For reclamation works it is used sand from sea quarry named ‘Odessa Bank’. Sand volume for March 2012 is 17108 m3.